Aggregate supply and granular base: 2026 unit prices
11 tendered items with their 2026 provincial averages, contract counts and two prior years, taken from Alberta's highway contracts.
STA 0+120What this group covers
Every paved road sits on gravel, and every gravel layer starts as a hole in the ground at a pit. This group covers the materials side of road building: aggregate supplied to a contract, granular fill, the prepared subgrade the gravel sits on, and the granular base course itself.
Most prices here are per tonne, which makes them easy to compare with a supplier's quote and easy to misuse. A tonne of base course supplied and placed on a highway is a different product, with different haul and placement costs, from a tonne of pit run picked up at the gate.
The 2026 workbook has 11 items in this group; 5 rest on ten or more contracts. Detailed pages: subgrade preparation, granular base course.
STA 0+240How these items are priced
Aggregate and base items are paid by weight (tonnes), by volume (cubic metres) or, for subgrade preparation, by the area prepared. Haul distance is the largest hidden variable: the same specification costs noticeably more in regions with few certified pits, which is why the main base course item carries separate regional averages and not one provincial number.
STA 0+360Every item, with 2025 and 2024 averages
Each row is the average of the three lowest bids on contracts tendered May 1, 2025 to June 24, 2026. Rows marked low sample rest on fewer than three contracts.
| Item | Unit | 2026 avg | Contracts | 2025 avg | 2024 avg | vs 2025 |
|---|---|---|---|---|---|---|
| Crush, Haul and Stockpile GravelItem A501 | m³ | $42.58 | 1low sample | — | — | — |
| Supply of Aggregate - With OptionItem A800 | t | $3.27 | 16 | — | — | — |
| Supply of Aggregate - No OptionItem A805 | t | $1.29 | 14 | — | — | — |
| Subgrade ExcavationItem B100 | m³ | $28.34 | 15 | — | — | — |
| Granular FillItem B152 | t | $40.83 | 9 | — | — | — |
| Granular FillItem B153 | t | $53.83 | 6 | — | — | — |
| Preparing Subgrade Surface (First Layer)Item B180 | m² | $2.03 | 21 | $1.5611 contracts | $2.3217 contracts | +30% |
| Preparing Subgrade Surface (Second Layer)Item B181 | m² | $0.80 | 1low sample | — | — | — |
| Granular Base CourseItem B281 | t | $26.75 | 1low sample | — | — | — |
| Granular Base Course - Des. 2 Cl. 25Item B282 | t | $33.65 | 26 | $29.0325 contracts | $32.5124 contracts | +16% |
| Granular Base CourseItem B283 | t | $56.33 | 1low sample | — | — | — |
STA 0+480The most-tendered items
The contract count is the best guide to how much weight an average can bear. In this group the most-tendered items are:
- Granular Base Course - Des. 2 Cl. 25 (item B282): $33.65 per t1 from 26 contracts
- Preparing Subgrade Surface (First Layer) (item B180): $2.03 per m²1 from 21 contracts
- Supply of Aggregate - With Option (item A800): $3.27 per t1 from 16 contracts
- Subgrade Excavation (item B100): $28.34 per m³1 from 15 contracts
- Supply of Aggregate - No Option (item A805): $1.29 per t1 from 14 contracts
STA 0+600Biggest year-on-year changes
Few items in this group have five or more contracts in both 2025 and 2026, so there is no reliable year-on-year comparison to show. The table above gives each item's own history.
STA 0+720Where to go next
Questions people ask
What is in the aggregate supply and granular base group of Alberta's unit price averages?
The 2026 workbook lists 11 items in this group, from Crush, Haul and Stockpile Gravel (item A501) to Granular Base Course (item B283). Each is the average of the three lowest bids on Alberta provincial highway contracts.
Which aggregate & base item is tendered most often?
Granular Base Course - Des. 2 Cl. 25 (item B282) rests on the most contracts in this group, with 26 contracts. Its 2026 average is $33.65 per t1.
Can I use these prices for a private project?
Only as a benchmark. These are highway-scale averages, and small private jobs usually pay more per unit because mobilization, minimum charges and disposal are spread over less work. Send your scope and quantities on the project brief for a real number.
Sources
- Unit Price Averages (workbook updated 2026-06-24)Alberta Transportation and Economic Corridors · 2026